|
 |

|
 |
|
Land facilities |
25000 sq.ft (Expansion to 100,000 sq. ft.)
|
Built-up facilities |
13000 sq.ft (Expansion to 50,000 sq. ft.)
|
Power facilities |
150 HP
|
Fabrication facilities |
Metal fabrication shops with
Electric E.O.T.Cranes
Hydraulic shears,
Hydraulic Press brakes,
Motorised Roller bender,Grinders,Buffers, Radial &
Pillar Drills, Arc Transformers, Argon Rectifier & Inverter
welders, Light machining shop, Dynamic Balancing facilities,Spray painting and powder coating facilities
|
Design facilities |
Computerised design, drafting/drawing systems
Softwares & manuals for air handling equipment/accessory
design
Standard & special designs for centrifugal & axial fans/
blowers
Standard & special designs for fabric filters & dust
collectors
Standard & special designs for cyclone separators
Standard & special methods for duct work & system
designing
|
IT Infrastructure |
Using Latest Computer Hardware and Software for
designing.
Well established Computer Network with internet and email
facilities certified by CompuBrain
|
Test facilities |
Instruments & test rigs for testing of Air volume,
Pressures, Power,Revolutions, Temperature, Noise level, Vibration
parameters
|
Experienced team |
Design & development head – Engineering, 32 years
experience
Field Executive head, air systems, 25 years experience
Controller head Manufacturing, 22 years experience
Controller head purchase, 23 years experience
Administrative & accounts head, 18 years experience
Autocad draftsman, 15 years experience
Fabrications & fitting teams, 25 years experience
Quality assurance systems, supervisors & field engineers
All mentioned above controlling equally skilled young and
dynamic workers.
|
Work force(Combined) |
Ranging about 75
|
Quality standards |
ISO: 9000/2001 Certified By TUV, Nord (Germany) (view copy of Certificate)
|
|
|
|
|
|